Well, I've shut down my two garden buckets for the winter. It was winding down anyway, and then we had a ton of rain from a TS that exacerbated my one tilted bucket. So, it made sense to shut down and prepare for a re-tooling for next Spring. This winter, I'll be building a level platform for three buckets to sit upon. And I think I'm going to try to run PVC pipe across the top of each bucket in a grid pattern to drip water down, rather than dumping all the water into one end of the bucket. This new approach will allow me to drain from the bottom, rather than the top, which should completely avoid any of my over-spilling issues that I had this year. More pipe = more costs, yes, but I think the effort will be worth it. I also plan to design in such a way as to be able to easily add more bucket capacity, should I want to or need to. Here are some more flowery shots from the pond area.
Cleaning The Mini Set
2 months ago
2 comments:
Brain-I would like to vist your system to understand what you have done-I have been to the UVI class and the Bryson City course-I am trying to get more info. How do I get ahold of you and make an appointment-I live in Snow Camp.
That's a bullfrog
Post a Comment
Note: Only a member of this blog may post a comment.